With the Maxem Energy Cloud, you can get more out of your existing connection.

By smart energy management, Maxem manages the available capacity in real-time between charging points, vehicles, buildings, solar panels, and batteries, without exceeding the contracted capacity.

Smart charging within your existing connection

Smart charging within your existing connection

Charge more vehicles without exceeding the contracted peak load (GTV).

Dynamically manage available capacity

Dynamically manage available capacity

Distribute energy in real-time based on building consumption, charging needs, and available grid space.

More charging capacity without grid reinforcement

More charging capacity without grid reinforcement

Many locations were not originally designed for large-scale electric charging.

As soon as multiple vehicles are charged simultaneously, peak loads arise, leading to:

  • exceeding the contracted peak load (GTV)
  • penalties from the grid operator
  • risk of overloading
  • high costs for grid reinforcement
  • long wait times due to grid congestion

Maxem prevents this by intelligently distributing the available capacity over all active charging sessions. Thus, you always charge maximally within the available capacity of your connection.
Dynamic power distribution in real-time

Dynamic power distribution in real-time

The available capacity at the location is continuously changing. Machines start up, buildings consume more energy, solar panels feed back, or batteries are charged.

With Dynamic Load Management (DLM), the Maxem Energy Controller measures in real-time how much capacity is available. The system then automatically controls the charging stations based on the current situation.

Scenario:
  • Is the building consumption low?Then vehicles can charge faster.
  • Is there a peak in the building?Then Maxem automatically scales back the charging capacity.
  • Is solar energy available?Then it is immediately used for charging or storage.

This way, you utilize every available kW optimally, without risk of overloading.
Protect your grid connection with GridGuard

Protect your grid connection with GridGuard

The physical limit of the connection must never be exceeded. That's why GridGuard continuously monitors the total energy consumption on site.

Even in cases of:

  • peak load
  • dropped internet connections
  • variable solar generation
  • battery discharge
  • simultaneous charging of multiple vehicles

the connection remains protected. The local Maxem Energy Controller intervenes in real-time when necessary.

When to use this?

Locations with a limited grid connection

Organizations waiting for grid reinforcement

Logistics locations with electric trucks or vans

Business locations with high simultaneous energy consumption

Offices, logistic hubs, and depots with solar panels or batteries

Situations where more charging capacity is needed without large infrastructure investments

Smart combination with solar panels and batteries

Smart combination with solar panels and batteries

Maxem not only looks at charging stations but at the entire energy ecosystem of the location.

This allows you to:

  • use solar energy directly for charging
  • store excess energy in a battery
  • apply peak shaving
  • smart charging during cheap energy moments
  • prevent peaks in grid consumption

Create one intelligently controlled energy system where charging, building consumption, generation, and storage fully cooperate.
Proven in complex situations

Proven in complex situations

Maxem is used daily at locations where grid capacity is extremely limited.

At transportation company Jan Bakker, for example, 15 electric trucks are charged on a grid connection of just 60 kW, by smartly using load management, batteries, and solar energy.

The result: no expensive grid reinforcement, no exceedances, lower energy costs, and deployable vehicles every morning

Discover what is possible within your connection

Schedule a demo and discover how Maxem achieves more charging capacity without grid reinforcement.

Discover what is possible within your connection
Beperkte netaansluiting | Maxem